STANDARD GAUGE RAILWAY 1946 FRE TO KAL SURVEY MAP REF: SG120/2R CCE 35998

1946
Subcollections
Overview

Avon River South Bank Contour Survey Map 1946 for Standard Gauge Railway
Map references SG120/2R CCE 35998 Mileage 36m 12ch - 37m 75ch (miles/chains). (58.18 - 61.05 Km)
Mileages on maps are believed to be calculated from Midland Station.
Within Shire of Toodyay Boundary.
Shows land contours and river bank with streams entering and roads or tracks.
Flood levels marked. Large stream shown entering river. Cleared and cultivated land. Land owner M. Markey shown. Also A. Markey with a river crossing shown. Land ownder J. Roach on lot 2147. Lot 1461 owned by Bank of NSW. Shed, garden and house shown. Road marked, holding yard, fences and soak.
Two possible railway alignment shown. Formed road.
NB: Map SG121 missing.

Historical information

Survey in 1946 by HT Williams, HS Marriott and RC Rowe for Chief Civil Engineer WAGR for standard gauge link to Trans Australia Railway at Kalgoorlie.
Without an agreement in 1960 with BHP for an iron and steelworks at Kwinana to process iron ore for Koolyanobbing this project may not have taken place.
Project eventually started 5th November 1962 and the first standard gauge trains ran through Toodyay 11th November 1966 from Merredin. Completion to Kalgoorlie to join up with the Trans Australia SG Railway happened in 1968.
Originally part of the Railway Heritage WA Museum collection, this map had been deaccessioned and was then passed on to the Newcastle Gaol Museum by a Railway Heritage volunteer in c2015.

Details

Details

Registration number
cwa-org-37-2018.10o
Item type
Width
79 cm
Height or length
201 cm
Year
Statement of significance

Historic: Survey in 1946 by HT Williams, HS Marriott and RC Rowe for Chief Civil Engineer WAGR for standard gauge link to Trans Australia Railway at Kalgoorlie.
Without an agreement in 1960 with BHP for an iron and steelworks at Kwinana to process iron ore for Koolyanobbing this project may not have taken place.
Project eventually started 5th November 1962 and the first standard gauge trains ran through Toodyay 11th November 1966 from Merredin. Completion to Kalgoorlie to join up with the Trans Australia SG Railway happened in 1968.

Primary significance criteria
Historic significance
Scientific or research significance
Shire of Toodyay

Shire of Toodyay

Organisation Details
View Collection
Item Feedback

Scan this QR code to open this page on your phone ->