Property of PM (Peter) Hewson and Company and BS Taylor, Katanning, Western Australia, Australia
1984Surveyor's Report on WISALTS Soil Conservation System created by PJ (Peter) Kerin.
Comments: Clay within 50 centimetres for most of bank. Sand seam at disposal point not to be cut right out. At points (A) and (B) construct bank as normal 60 to 70 centimetres deep. After bank construction at points (A) and (B) backhoe to be used to excavate and backfill with clay (dozer operator to note any other suspect areas!!).
This document is part of the WISALTS (Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated) Collection.
Copyright and Reference
Copyright and Reference
Preferred Citation
[Identification of item], Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated (WISALTS) Collection, QB 15, Special Collections, Geoffrey Bolton Library, Murdoch, Western Australia.
Murdoch University Library
Murdoch University Library

Scan this QR code to open this page on your phone ->
