Property of P (Peter) and (Paul) Lucas, Dumbleyung, Western Australia, Australia

1987
Overview

Surveyors Report on WISALTS Conservation System created by ME (Mostyn) Franklin. Comments: Grade banks to be constructed first. Check with owners at completion of grade work. Level work to start from very top bank. Banks numbered in order of construction to be 1 metre minimum deep. Level banks (6) and (7) must be blocked each side of crab holes (standard ute gaps and blocks rest). Grade bank (10) at least 100 metres into neighbours. 30 foot flyovers under all joins. This document is part of the WISALTS (Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated) Collection.

Details

Details

Registration number
cwa-org-138-WISFP000468.1.2019
Item type
Width
24 cm
Height or length
37 cm
Year
Permissions

You may download and print a single copy for your personal, non-commercial use. Further use of a work may infringe copyright. If the material is required for any other purpose please contact Murdoch University Special Collections, SpecialCollections@murdoch.edu.au

Attribution requirements

Preferred Citation [Identification of item], Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated (WISALTS) Collection, QB 15, Special Collections, Geoffrey Bolton Library, Murdoch, Western Australia.

Murdoch University Library

Murdoch University Library

Organisation Details
View Collection
Item Feedback

/sites/default/files/records/2021-06/138-WISFP000468.1.2019-WISFP000468.1.2019.pdf
Media file preview
/sites/default/files/media-preview-images/2024-10/39028-ee0d654448759bffb4d889838957bd8c.jpg

Scan this QR code to open this page on your phone ->