Property of PM (Peter) Clayton, Broomehill, Western Australia, Australia
1984Surveyor's Report on WISALTS Soil Conservation System created by PJ (Peter) Kerin.
Comments: Broomehill Shire have been contacted re end of bank (E) and given OK. Bank (A) 0.3 kilometres. Join to existing banks can flow either way. (B) 0.3 kilometres. Cut out ridge between marks in line. Note try to stay on top of clay layer about to down. (C) 0.3 kilometres. Variable depth to approximately 70 centimetres. (D) 0.4 kilometres. Small ridge to be cut out between 2 wet spots. (E) 0.2 kilometres. Runs parallel with Telecom cable. Check with Telecom. Cable to be crossed at exit point on to road reserve. (F) Existing bank (G) to be connected to existing (H) to bring water out of (H) into (G). Some work to be done at culvert to make sure it is working.
This document is part of the WISALTS (Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated) Collection.
Copyright and Reference
Copyright and Reference
Preferred Citation
[Identification of item], Whittington Interceptor Sustainable Agriculture Land Treatment Society Incorporated (WISALTS) Collection, QB 15, Special Collections, Geoffrey Bolton Library, Murdoch, Western Australia.
Murdoch University Library
Murdoch University Library

Scan this QR code to open this page on your phone ->
